OSG Solar I-III LLC
Orange, MA
We acted as EPC for this complex solar project which was completed on time, within budget & according to project goals.
Project Description
Our team was responsible for engineering, procuring and constructing this 2.745 mW project. The site was located on an old gravel pit and was the perfect location to install five 500 kW inverters, fed from 75 combiner boxes, and a total of 11,440 modules that are 240 W. Our role was to engineer the project, procure all of the equipment/components, and perform the general construction duties. As one of the more involved and challenging solar projects, it was completed on time, on budget, and satisfied everyone’s goals.