Westover ARB Fuel Hydrant
Chicopee, MA
A complete electrical installation for a new fuel hydrant system
Project Description
Our team constructed a new jet fuel pumping facility, wired a tank control circuit, and installed a state-of-the-art grounding/bonding system that ensures static is properly discharged to eliminate any possibility of a catastrophic spark. This project required the use of explosion-proof fittings and strict attention to detail. And since this project was on the flight line, our team members had to keep public safety in mind at all times and work closely with all base personnel to ensure our presence was not disruptive to their normal course of operations.